1.1 Promote economic cooperation
Regionet Aktív
Development and implementation of a coherent and bilateral SME network on regional and cross-border level in the border region of Burgenland, Győr-Moson-Sopron County, Niederösterreich, Steiermark and Vas CountyDuration: 04. 2008-12. 2012 ERDF: 2.463.470 € Total costs: 2.898.200 €
Ecostrat
Development of joint and cross-border economic strategies for the area of Burgenland - West-HungaryDuration: 04. 2008-12. 2012 ERDF: 581.079 € Total costs: 1.222.057 €
Tourist-Net
Tourism without borders in West-Pannonia - Burgenland: Together is easier!Duration: 04. 2008-12. 2012 ERDF: 844.974 € Total costs: 1.345.800 €
FaKlim
Beech (Fagus sylvatica) decline and climate change in the region of West-Pannonia: Cause analysis and adaption methodsDuration: 04. 2008-02. 2011 ERDF: 177.564 € Total costs: 208.899 €
KNEIPP
Kneipp unites - Bilateral health and tourism development based on the therapies developed by KneippDuration: 04. 2008-06. 2012 ERDF: 849.985 € Total costs: 999.983 €
IRIS
Interregional Innovation SystemDuration: 06. 2008-08. 2012 ERDF: 1.887.864 € Total costs: 2.478.226 €
alpannonia
Extension of the long-distance hiking trail "alpannonia" from Kőszeg to Semmering and farther to region of Joglland WaldheimatDuration: 06. 2008-12. 2011 ERDF: 1.313.310 € Total costs: 2.238.101 €
RegIonCo
Regional Cooperation for ionic therapyDuration: 07. 2008-03. 2012 ERDF: 1.436.928 € Total costs: 1.921.699 €
ÖRRAGO
Competence Network in the region of the trilateral nature park ŐRSÉG -RAAB- GORIČKODuration: 09. 2008-09. 2012 ERDF: 1.813.784 € Total costs: 2.133.863 €
PIKNIK
The way to freedomDuration: 03. 2009-12. 2011 ERDF: 366.979 € Total costs: 466.398 €
PILGRIMAGE AT-HU
Pilgrimage in Central Europe - Development of a central european network of pilgrimage routes in Austria-HungaryDuration: 03. 2009-08. 2012 ERDF: 543.283 € Total costs: 795.682 €
INNOVAL
Support of companies from the field of mechatronics and 'smarthouse' at reaching new innovations, development of an interregional innovation networkDuration: 12.2010-12.2013 ERDF: 864.489,46 € Total costs: 1.017.046,58 €
Leitha-Lajta AT-HU
Development of a cross border touristic offer to visit the Leitha/Small Leitha river with canoes, starting from Bruckneudorf to MosonmagyaróvárDuration: 12.2010-06.2013 ERDF: 635.340 € Total costs: 820.200 €
CEPO
Establishment of a university co-operation based on a common cross-regional research collaboration in the teaching and research of poultryDuration: 12.2010-12.2013 ERDF: 698.802,62 € Total costs: 822.120,82 €
Natur-Kulinarium
New knowledge-based quality in the course of positioning of the region as the "Garden of Austria," future-oriented tourism products to the comprehensive experience of the region-specific natural and cultural landscapesDuration: 02. 2011-06. 2014 ERDF: 1.058.176,33 € Total costs: 1.244.913,33 €
ESP
Promotion of energy efficiency and economically sound use of renewable energy in businessesDuration: 02.2011-02.2014 ERDF: 396.204,92 € Total costs: 466.123,46 €
1.2 Increase the sustained growth of labour
IGR
Future in the border regionDuration: 12. 2007-12. 2014 ERDF: 3.980.147 € Total costs: 6.939.244 €
Educorb
Educational Cooperation in the Border RegionDuration: 12. 2007-03. 2012 ERDF: 708.175 € Total costs: 833.459 €
EXPAK AT-HU
Austrian-Hungarian Expert Academy 2008-2013Duration: 04. 2008-02. 2014 ERDF: 1.227.066 € Total costs: 1.959.632 €
NetLab
Network for Labourmarket Cooperation in the Border Region HU-ATDuration: 04. 2008-03. 2013 ERDF: 435.914 € Total costs: 737.876 €
EdTWIN
Education Twinning for European Citizenship, Heading for Excellence in the CENTROPE REGIONDuration: 05. 2008-12. 2011 ERDF: 625.243 € Total costs: 735.580 €
OPTICOM
Optimisation of intercultural communication & collaboration Austria – HungaryDuration: 09. 2009-12. 2011 ERDF: 491.790 € Total costs: 578.577 €
AC Centrope II
AC-CENTROPE - Automotive Cluster Centrope - Continuation of the cross-border cooperation platform between ACVR and TU Győr in order to strengthen the automotive sector in the Centrope region, and extension of the Automotive Academy to HungaryDuration: 04. 2010-12. 2012 ERDF: 717.060 € Total costs: 843.600 €
PHCC
PassiveHouseCraftsmenCourse - Development of Europe's first modular passive house course in craftsmen language in preparation for the ECVET credit system and cross-border implementationDuration: 04.2011-12.2012 ERDF: 384.610 € Total costs: 452.482 €
1.3 Ensure the quality of social infrastructure and public services
HEALTH
Cross-national information platform - energy and resource efficiency in the health sectorDuration: 03. 2009-09. 2012 ERDF: 2.021.269 € Total costs: 2.377.964 €
BrandHÁZ
Planning and constructing a bilingual fire-fighter training centreDuration: 02. 2008-08. 2011 ERDF: 2.351.667 € Total costs: 2.766.668 €
NeuRISK
Joint regional cooperation in risk prevention and emergency management in the area of Győr-Moson-Sopron and BurgenlandDuration: 08. 2008-01. 2012 ERDF: 346.638 € Total costs: 407.810 €
STWA
Renewal and extension of the storm warning system around Lake FertőDuration: 09. 2008-10. 2010 ERDF: 426.590 € Total costs: 501.870 €
2.1 Improve eco-mobility, transport and regional accessibility
GreMo Pannonia 2008-2011
Cross-border mobility Burgenland - West-HungaryDuration: 04. 2008-08. 2012 ERDF: 2.735.530 € Total costs: 3.218.270 €
TRANSBORDER
Reconstruction of the road between Ágfalva (Agendorf) and Schattendorf (Somfalva)Duration: 04. 2008-09. 2011 ERDF: 427.689,90 € Total costs: 612.204 €
Grundlagenstudie NSB AG
Feasibility study for upgrading works of the cross-border train line Neusiedler Seebahn AG between Fertöszentmiklós and Neusiedl am See (with regard to planned investments in roadbed and safety installations)Duration: 03. 2009-08. 2010 ERDF: 115.770 € Total costs: 136.200 €
LANDMARK-RUBBER
LANDMARK-RUBBER - together for the permeability of the border regionDuration: 04. 2010-01. 2013 ERDF: 890.939 € Total costs: 1.050.305 €
Fertő-Hanság mobil
Environmentally friendly mobility Fertő-HanságDuration: 04. 2010-06. 2014 ERDF: 6.223.020 € Total costs: 7.321.200 €
VKM AT-HU
Development of an integrated, intermodal, cross-border traffic generation and assignment modelDuration: 02.2011-09.2013 ERDF: 304.452,65 € Total costs: 358.179,59 €
2.2 Enhance cross-border governance system
Recom
Regional Cooperation Management HU-ATDuration: 12. 2007-01. 2012 ERDF: 1.695.416 € Total costs: 1.994.610 €
Welterbe
Implementation of the management plan for the UNESCO World Heritage Site Fertö-Neusiedler SeeDuration: 01. 2008-09. 2010 ERDF: 301.750 € Total costs: 355.000 €
City Cooperation
Establishing the co-operation of cities in the border region of Eastern Styria, Eastern Slovenia and Southwestern Hungary; development of joint future strategies and implementation of some first pilot activitiesDuration: 04. 2008-03. 2013 ERDF: 1.190.000 € Total costs: 1.400.000 €
Kick-Off
Kick-Off -Youth on the ballDuration: 04. 2008-12. 2011 ERDF: 347.361 € Total costs: 408.660 €
BILKIG
Pre school bilingual educationDuration: 04. 2008-10. 2011 ERDF: 179.063 € Total costs: 210.700 €
CommonGIS
Partnership along the border - cross-border geographical information servicesDuration: 03. 2009-08. 2011 ERDF: 378.773 € Total costs: 446.091 €
2.3 Improve the management of natural resources
Aqua Bgld – Sopron
Securing the water supply in the cross-border Pannon-Fertő regionDuration: 01. 2008-12. 2013 ERDF: 4.114.974 € Total costs: 5.820.323 €
ProRaab(a)
Flood prognosis model for the river Raab/RábaDuration: 02. 2008-12. 2010 ERDF: 1.180.871 € Total costs: 1.389.260 €
OpenWehr
Weir permeability of the river Raab/RábaDuration: 04. 2008-06. 2011 ERDF: 1.696.600 € Total costs: 1.996.000 €
PaNaNet
Developing and establishing a network of nature and national parks in Burgenland and West-HungaryDuration: 04. 2008-12. 2013 ERDF: 1.551.322 € Total costs: 1.949.936 €
ESPAN
Pannon Energy StrategyDuration: 04. 2008-12. 2012 ERDF: 2.796.917 € Total costs: 3.290.490 €
PinKanAb
Refurbishment and expansion of the sewage treatment system along the river PinkaDuration: 04. 2008-11. 2012 ERDF: 946.670 € Total costs: 1.631.675 €
CEEBEE
Center of excellence for energy efficient construction and renewable energyDuration: 09. 2008-09. 2011 ERDF: 451.746 € Total costs: 531.466 €
FERTO-NEU-NAT
Cooperation in environmental education Fertő-Hanság/Neusiedler See-SeewinkelDuration: 09. 2008-09. 2012 ERDF: 546.170 € Total costs: 836.340 €
RLM
Regional air pollution monitoring systemDuration: 09. 2008-12. 2014 ERDF: 2.622.021 € Total costs: 3.084.731 €
Solarschule II
Development and extension of the existing solar schools in Güssing and SzombathelyDuration: 09. 2008-11. 2011 ERDF: 378.836,37 € Total costs: 445.689,88 €
ECOWIN
Nature protection through ecological vinicultureDuration: 03. 2009-12. 2013 ERDF: 648.076 € Total costs: 762.443 €
BIORES-AT-HU
Recycling of biogenic resources in the region West-Hungary, Vienna and BurgenlandDuration: 03. 2009-06. 2014 ERDF: 1.165.450 € Total costs: 1.374.786 €
REBE
Regional cooperation and knowledge transfer in the field of bioenergy and energy efficiencyDuration: 10. 2010-09. 2013 ERDF: 334.468 € Total costs: 484 080 €
E-Contract
Improvement of energy efficiency in public buildings and facilities by the increased use of energy-contracting models in AT und HUDuration: 04.2011-02.2014 ERDF: 221.000 € Total costs: 260.000 €
SONDAR HU-AT
Improvement of quantitative and qualitative soil protection through awareness-raisingDuration: 02.2011-12.2013 ERDF: 430.299 € Total costs: 506.403 €
IGEN
Innovative Cross-border-Uniform-Sustainable: organizational model for large protected areas on the southern edge of Vienna - collaborations and networks. The example of natural park - Írottkő Geschriebenstein.Duration: 04.2011-12.2013 ERDF: 276.200 € Total costs: 326.010 €
